Track Record Texas Power Builds

Three flagship sites.
30.5 MW activated.

Greenfield builds across Texas, sponsor-grade documentation, commissioned to nameplate — ready to host hashrate, compute, or industrial loads from day one.

0
Operating Sites
0 MW
Activated
0%
Greenfield EPC
0
Commissioning Defects
Site I · Central Texas

Industrial corridor.

Central Texas · Operating
3.5MW
Activated Capacity
Greenfield
EPC Scope
Operating
Status

Greenfield build on a legacy industrial corridor — leveraging existing power infrastructure for a fast time-to-energization. Self-performed civil, mechanical, and electrical with a single accountable schedule. Commissioned to nameplate with a sponsor-grade close-out package.

Civil Foundations MV/LV Power Switchgear Commissioning
Site II · South Texas

Greenfield campus.

South Texas · Operating
10MW
Activated Capacity
Greenfield
EPC Scope
Nameplate
Commissioning

South Texas greenfield build delivering 10 MW of activated capacity. Substation, switchgear, and MV/LV distribution scoped, integrated, and energized by BCGC under one schedule. Site is host-ready for hashrate, AI compute, or industrial loads at full nameplate.

Site Civil Substation Switchgear MV/LV Mechanical Commissioning
Site III · West Texas

Largest footprint.

West Texas · Operating · Largest Site
17MW
Activated Capacity
Largest
Site Footprint
Operating
Status

BCGC's largest activated build to date. Full EPC scope including site civil, foundations, MV/LV power distribution, and mission-critical mechanical and electrical systems. Commissioned to nameplate and operating in West Texas — sponsor-grade close-out, no commissioning defects.

Site Civil Foundations Substation Switchgear MV/LV Mechanical Electrical Commissioning
What Every Build Delivers The BCGC Standard

Six standards we hold
on every project.

i.

Sponsor-grade basis-of-design.

Single-line diagrams, load calculations, thermal modeling, and a defensible BOD package — diligence-ready from the engineering study phase.

ii.

Commissioned to nameplate.

Performance validation against the design spec. Sites operate at their rated capacity from day one, not after a year of punch-list closure.

iii.

Self-performed across trades.

Civil, mechanical, electrical — under one roof. No subcontractor handoffs hiding schedule risk or commissioning defects.

iv.

Lender-ready close-out.

Final O&M manuals, as-builts, commissioning reports, warranty documentation — the package lenders ask for, ready when they ask for it.

v.

Transparent schedule.

Single accountable EPC schedule. Updates flow weekly, risks surface early, and there's never confusion about who owns what.

vi.

Long-term relationship.

Optional O&M partnerships for sites we build. We're not done at energization — we operate what we deliver.

Have a site? Talk to us

Bring us your next build.

Greenfield, retrofit, or advisory. Tell us about your power, your timeline, and your load — we'll come back with a candid path forward.